首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   6篇
  免费   0篇
  2013年   4篇
  2005年   1篇
  1998年   1篇
排序方式: 共有6条查询结果,搜索用时 0 毫秒
1
1.
2.
3.
4.
This study introduces one modeling methodology that describes a broad range of multiple stage production planning issues, including multiple limited resources with setup times and joint fixed cost relationships. An existing production system is modeled in this fashion, creating a new set of 1350 highly generalized benchmark problems. A computational study is conducted with the 1350 benchmark problems introduced in this paper and 2100 benchmark problems, with more restrictive assumptions, from the existing literature. The relative merits of a decomposition‐based algorithm and a neighborhood search technique known as NIPPA, or the Non‐sequential Incremental Part Period Algorithm, are assessed. NIPPA is generally the more successful of the two techniques, although there are specific instances in which the decomposition‐based algorithm displayed a distinct advantage. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   
5.
Least squares fitting of regression models is a widely used technique. The presence of outliers in the data can have an adverse effect on the method of least squares, resulting in a model that does not adequately fit to the bulk of the data. For this situation, robust regression techniques have been proposed as an improvement to the method of least squares. We propose a robust regression procedure that performs well relative to the current robust methods against a variety of dataset types. Evaluations are performed using datasets without outliers (testing efficiency), with a large percentage of outliers (testing breakdown), and with high leverage outliers (testing bounded influence). The datasets are based on 2-level factorial designs that include axial points to evaluate leverage effects. A Monte Carlo simulation approach is used to evaluate the estimating capability of the proposed procedure relative to several competing methods. We also provide an application to estimating costs for government satellites. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 125–139, 1998  相似文献   
6.
The 2005 Review Conference of the Treaty on the Non-Proliferation of Nuclear Weapons (NPT) failed to produce any agreed action plan for addressing nuclear disarmament or proliferation. Detailed discussions and negotiations on such a plan were much curtailed because of procedural wrangles. This article describes the evolution of the conference and argues that changes in the international political environment and problems inherent in the revised NPT review process agreed at its 1995 Extension Conference contributed to the meager outcome. The main issues raised by delegations in their plenary statements, working papers, and the limited time available for interactive discussion are summarized, and three perspectives are offered on the reasons for the lack of any substantive product. Finally, the implications of that failure for the NPT, its review process, the wider regime for international nuclear governance, and nuclear disarmament, nuclear nonproliferation, and the peaceful use of nuclear energy are examined.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号